A local desktop work journal for the day you planned and the work that actually happened. Built with Tauri 2, React, TypeScript and SQLite. The first target is CachyOS with Hyprland.
Create projects and tasks, start a timer, capture interruptions, review a new schedule and prepare a daily manager report. Your original commitments, remaining estimates and current forecasts stay separate. Everything needed for tracking works offline without an account. OZT/Zoho integration is optional and uses an isolated profile.
Development requires Node 22+, pnpm, Rust, and the Linux GTK/WebKitGTK prerequisites documented by Tauri. Dependencies and lockfiles are included.
pnpm install
pnpm devpnpm dev runs the native Tauri app. If a project-local Rust toolchain exists in .toolchain/, the command runner uses it without changing your shell configuration. Otherwise it uses Rust from PATH.
For browser development with the same Rust engine and real SQLite persistence:
pnpm dev:browserOpen http://127.0.0.1:1420. This mode has a local development bridge and a separate .dev-data/ database. It is not a mock and does not access the native app's data. The bridge only exists in the development server; it is absent from production assets. Use the native app for real OZT connections so slow external commands run independently of recording work.
The native database lives in Tauri's app-data directory for io.dhyantd.openwork, normally ~/.local/share/io.dhyantd.openwork/ on Linux. Settings shows its exact location. Source checkout and user data are separate.
pnpm verify
pnpm test:e2e
pnpm desktop:buildBrowser tests use a fresh generated database under .dev-data/tests-* on port 1421. They do not clear the user's workspace or contact Zoho. Install the test browser once with pnpm exec playwright install chromium if needed.
The desktop build creates a native binary and requests an AppImage under src-tauri/target/release/. See acceptance evidence for the actual artifact and tested status. A successful compilation alone is not proof of all native/compositor acceptance scenarios.
- Timer switches and audit records commit together. Restart/suspend gaps need review; overnight time is not automatically charged as work.
- Moving a planned block never creates actual hours or silently changes a deadline. Resize changes reservation capacity; change the remaining estimate explicitly in the task editor.
- Local work notes and backup databases are not encrypted. Keep backups private. Report text excludes private requester names and activity notes by default.
- Backup produces a SQLite snapshot and matching checksum manifest. Keep both files. Restore validates the backup and saves current data first. Restored external submissions require reconciliation.
- Optional OZT operations never use its normal profile or timer. Review every export batch. An uncertain outcome pauses repeat submission, even if OZT returned exit code zero.
- Live Zoho acceptance needs a user-authorized low-risk project and separate device login. No live Zoho time logs have been created by implementation tests.
See the approved plan, domain glossary, core behavior, OZT integration guide and acceptance evidence.
Start with the user guide and backup/recovery guide. Release metadata and the AppImage checksum are recorded in release.json. Packager downloads are cached inside .build-cache/ when no custom cache location is configured.
The approved Workspace layout uses fixed desktop panes, a persistent timer, searchable commands (Ctrl+K) and task/activity inspectors. Resize or hide the side panes, and select System/Light/Dark appearance in Settings. The native window has its own title-bar controls and keeps the existing timer-close safeguard. SQLite records, original commitments and OZT isolation are unchanged by the interface update. Details and shortcuts are in the interface guide.
Use Schedule task to reserve remaining work from an explicit future start; preview and apply before it appears on that day's plan. Due by is a separate optional finish-by deadline. Task details show scheduled start and estimated finish independently. Applying a stale preview is rejected instead of substituting a newer workspace version.
Add Coffee (20 minutes), Lunch (40 minutes), short or custom breaks directly above the day timeline. Breaks have a separate labelled lane and support drag, resize and exact duration editing. The default moves an overlapping break after the task. Keeping the break at its requested time offers a revised plan and optional agreed-deadline extensions before Apply. Task duration edits can change reserved time alone or explicitly revise remaining effort. Original commitments and actual records are preserved. See the guide.
Schema 1 workspaces receive a consistent backup before upgrading to schema 2; legacy lunch gaps become visible movable breaks for the next 90 calendar days. Native gesture and full release qualification gaps remain documented in acceptance.
Drag the bottom handle of a started break or task to extend or shorten its reserved time. The end stops at the current time rounded up to the next minute. Started flexible breaks keep their accepted start, and the clock is checked again on Apply. Recorded work, estimates and commitments retain their existing review rules. No database migration is needed.
Task blocks have visible duration grips in both timeline lanes and the compact week view. Drag closed Actual records to move or resize them, then review and save a correction with a reason. Original records remain in history and overlapping/stale changes are rejected. A live task's Actual grip adjusts its planned end while the timer continues recording. See the task-time controls.
Choose Auto-stop at deadline in New/Edit task to stop its running timer at the agreed due time. Tasks stay open for review; standard tasks keep manual stopping. A Rust background worker handles hidden windows, and restart/sleep gaps retain explicit review. Schema 3 preserves existing manual defaults and backs up modified/populated workspaces before upgrade. See deadline timers.
The sidebar groups each project's tasks by their first scheduled date on or after the day you are reviewing. Change the timeline date to move the focus between date groups. Unscheduled tasks remain visible. Settled keeps completed tasks and tasks whose final planned block is before the reviewed day available without crowding current planned work; opening or starting one never changes its task status.
Click a project name or chevron to expand or collapse it. Each project has Scheduled, open by default with date dividers, and Unscheduled, initially collapsed. Settled has the same structure, with scheduled dates ordered most recent first. Each project's collapse choices are remembered separately in active work and Settled. Search reveals matching tasks in collapsed groups. The list icon beside a project opens its task table.
In New/Edit task, Due by and Remaining effort sit together. Changing either updates the other from Start at; changing Start at recalculates Due by. Passed/unscheduled starts use the next whole minute. New tasks propose a due time immediately and keep Auto-start/Auto-stop defaults. Existing tasks retain their values until a timing edit; saving confirms the displayed pair and preserves original commitment history. Calendar availability and forecast finish remain separate. See the guide.