An original, playable city-building prototype: a Python simulation and a texture-free, procedurally modelled Three.js city. No SimCity code or assets are used.

SimMetro city development progress

See the feature inventory and phased roadmap for the path from this prototype to a full-featured SC4-style city simulator, including completion gates.

Run on Windows

Requires Node.js 22.18+ and Python 3.15 (tested on 3.15). Commands below use PowerShell. npm.cmd avoids Windows PowerShell's script execution-policy restriction.

# First-time setup. If Python is not on PATH, uv can provide it.
uv venv --python 3.15 .venv
uv pip install --python .venv\Scripts\python.exe -r requirements.txt
npm.cmd install

# Build the UI, then serve everything from Python.
npm.cmd run build
python main.py

Open http://127.0.0.1:8000. Keep the terminal running. Do not use multiple Uvicorn workers: this milestone has one authoritative, in-memory region.

For subsequent starts, just run python main.py. The launcher automatically uses the project's .venv when present. Use python main.py --port 8001 for another port. If Python is not on PATH, run .\main.cmd instead; it uses .venv directly.

Server, access and application output is written to the rotating logs/simmetro.log file instead of flooding the terminal. Four 5 MB historical files are retained. Use python main.py --log D:\path\simmetro.log to choose another location.

Without uv, use an installed Python to run python -m venv .venv, followed by .\.venv\Scripts\python.exe -m pip install -r requirements.txt.

For frontend development, run the backend as above and npm.cmd run dev in a second terminal. Open the Vite URL it prints; Vite proxies /api to Python. Rebuild the frontend before using the Python-served UI again. Restart Python after the first build so it mounts the generated UI.

Play

You begin with a small town and $24,000, set in the middle of a 100 x 100 coastal district in a streamed region. Terrain supports levels -32 through +96: a western sea, inland lakes, beaches, rolling hills, and snowy peaks. Neighbouring tiles never differ by more than one level, so roads and lots always follow the land. The starter streets do not extend to the district edge. Local roads support power, jobs, commuters and freight without a connection to the district edge.

The art style is "SC4 without textures". Terrain is one continuous, faceted heightfield of flat-coloured triangles: same-level areas form flat plateaus, and each change of level becomes a ramp spread across the two neighbouring tiles. Roads and zone lots are painted onto that surface, so a road climbs a hill by driving up the ramp. Its steepest grade is one level per tile. Buildings sit at their tile's level, with a foundation going down into the downhill side. Wherever a building or park faces a road, a raised pavement runs along the road's verge in front of it, following the slope and staying clear of the lanes.

  • Inspect / 1: click a tile for its development, elevation or water depth, power, and road access.

  • Road / 2: select Street, Local road, Avenue or Express road, then drag to build. Diagonal drags create connected stair-step roads. Paint existing roads to change their type, paying the full new construction price per changed tile; repainting the same type is free. Old saves retain local roads.

    Type Build/tile Monthly upkeep Capacity Free-flow minutes/tile
    Street $6 $1 150 0.45
    Local road $12 $2 400 0.30
    Avenue $30 $5 900 0.24
    Express road $50 $8 1,400 0.18

    Road types have distinct surface shades; streets omit centre dashes. Capacity and speed affect commute routing and congestion. All types occupy one tile, provide lot access and power connectivity, and use the same animated two-way lanes and junction rules. Express roads are not limited-access motorways.

  • Residential / 3, Commercial / 4, Industrial / 5: paint zones directly beside roads. Choose a subtype in the panel under the tools (see below). Serviced zones grow through up to four development levels. Businesses also need a local surplus of workers before they open or expand. Repainting an undeveloped zone with another subtype changes its type.

  • Power / 6: place coal, solar, nuclear, wind or battery facilities beside a road. Choose the subtype in the tool panel.

  • Water / U, pipes / J, remove pipes / K: place a pump or tower, connect its entrance road and power, then pipe its northwest anchor and neighbourhood. See Water and underground infrastructure below for capacities and shortages.

  • Power lines / L: drag pylons across dry empty land, or place aligned pylons up to 8 tiles apart to bridge gaps, including water. Lines can cross roads without replacing them. Adjacent roads and lots share power automatically.

  • Park / 7: place green space with a small nearby move-in bonus, with $8 monthly upkeep per tile.

  • Bulldoze / 8: remove development before replacing it. There are no refunds.

  • Raise land / 9, Lower land / 0: drag a rectangle of empty tiles to move it one level, $20 per changed tile. Surrounding empty land is reshaped automatically to keep slopes gentle. The change is rejected if it would disturb development. Lower land below sea level to dig lakes, or raise the seabed to reclaim it.

  • Scroll to zoom, right-drag to orbit, middle-drag or WASD/arrow keys to pan. Escape cancels a stroke. Touch supports single-finger construction and two-finger camera navigation. Zoom out to see the whole region.

  • Use map layers to check zoning, power service, local road access, terrain elevation and traffic volume.

  • Speeds: Ⅱ pause, Day (live: one day per real minute, so a month takes 30 minutes), 1× (one month every two seconds) and 3×. Space pauses and resumes the last running speed. The time of day always runs at one day per minute, so cars and day/night lighting animate in every mode; only in Day mode does the calendar follow that clock.

  • ▶ Showcase hides the interface and slowly circles the current view centre, once every 12 game hours, for recording footage. The elevation rises and falls, tilting toward the horizon at night to show the stars. The zoom breathes between about 0.55× and 1.6× of the distance you started from, so a wide shot stays wide and a close-up stays close. Esc or the exit button returns control.

Streamed districts and region view

Each city district is 100 x 100 cells. The starting town is district (0, 0). Pan across a boundary to generate and enter new, initially undeveloped districts; negative coordinates work too. Region view zooms out, and Starting city returns to the original district. Zoom back in to build and inspect.

The camera's district is the focused simulation and its eight neighbours are materialised and run as a 3 x 3 active window. World coordinates are canonical: storage chunks are derived from them, roads join across loaded chunk edges, and employment is matched over the resulting continuous road components. Detailed vehicle animation remains focused near the camera.

Detailed districts now load by distance from the view target to each district's bounds, before the camera crosses an edge. The loading radius grows from 96 to 144 cells with zoom, with an extra 32-cell retention band to prevent repeated loading/unloading near a threshold. This includes neighbours at edges and corners. Nearby developed districts run full-rate simulation; distant ones batch simulation every two real seconds with up-to-30-minute power dispatch. Monthly growth, employment, condition and budgets still run. Battery dispatch and outage timing are approximate offscreen. Empty terrain has no economy to simulate.

Nearby districts use the same detailed renderer as the focused city: matching terrain, building models, trees, windows, shadows, smoke and wind turbines. They share one WebGL context and animation loop. Detailed vehicle simulation remains in the focused city. Farther districts use simplified building masses and terrain sampled every 4, 16 or 32 cells. All LODs retain matching half-cell borders to avoid cracks. The view retains at most a 7 x 7 patch and releases geometry outside it. Sky-coloured distance fog follows zoom and time of day. The detailed view switches to overview meshes at distance 300 and back at 260. Render cache identities reset on region load, including when the loaded terrain shares old revision numbers.

New regions use six octaves of seeded gradient-Perlin noise in absolute world coordinates, with feature wavelengths of 128, 64, 32, 16, 8 and 4 cells. Smaller hills, valleys and terrain variations fit the city-building scale. There is no district-local normalization, repeated border template or mirroring. Border vertices average terrain from both sides, so slopes continue across region edges at every LOD. The starter town follows the natural terrain; if its usual position is wet, the layout moves to the nearest dry site without changing the land. Natural terrain is limited to -12 through +32 levels, with each level 0.6 world units tall. The wider -32 to +96 range remains available for terrain editing and save compatibility. Elevation colours, woodland and snow bands match the smaller landscape; neighbouring cells still differ by at most one. NumPy batches generation to keep region streaming responsive. Empty visited districts can be evicted and regenerated; developed districts stay in memory and continue simulation. Terrain generation runs away from the main simulation event loop. The cache is bounded, but memory and simulation cost still grow with the number of developed districts; this is not yet a worker-based simulation of an arbitrarily populated world.

Budgets, power and water are currently chunk-local. Roads and labour markets cross loaded chunk boundaries; detailed vehicle routes are still rendered only for the focused chunk. Terraforming is rejected if any part of its slope cascade would change the outer row of a district, preserving shared terrain until cross-district transactions are implemented. Construction strokes never cross districts.

Saves include the region's explored districts, generated-terrain basis, focused district and all retained city states. Older 200 x 200 and 256 x 256 city saves cannot fit into the smaller district and are rejected explicitly rather than cropped. Generator versions are persisted: old saves keep their original terrain and generation profile (including earlier Perlin versions) so development is not moved or submerged. Start a fresh region (restart the server without loading an old save) to explore the new Perlin landscape.

Traffic and daily routines

Each month's employment result is turned into a daily trip plan (backend/traffic.py). Within each road network, homes send their employed residents to the nearest workplaces that still need staff (repeated multi-source breadth-first searches over road tiles). Shift times vary by home and workplace: offices and shops start between 07:30 and 10:00, with some part-timers from midday. Industry starts 05:30-07:30, and a quarter works a late shift from 14:00. Shifts last 8-9.5 hours. One in four residents who don't work makes a daily shopping trip, and staffed factories send trucks to the nearest developed commercial lot on their road network.

Routes are assigned incrementally with congestion in mind. Each home's commuters are routed in four slices. Every slice takes the currently quickest path, with each road tile slowed by a BPR-style curve against each road type's capacity. Its load is added before the next slice, so a busy road sheds commuters onto parallel streets or longer detours once they become quicker. Light traffic keeps to the shortest route. The dashboard shows daily commuters, the average commute, congested road tiles, vehicles on the road, cars stopped in queues and how many people each on-screen car represents. Inspect a home to see its residents' day (including how many routes a commute is split over), a business for its staff's shifts, or a road for its peak load.

The browser (src/traffic.ts) turns the plan into a car-following micro-sim:

  • Varied journeys. Each driver has their own habits (early or late, how long they stay on) plus daily randomness: departures spread across about half an hour, around 6% of workers are absent on any day, and shoppers don't go every day.
  • Personal space. Cars follow the car ahead in their lane with a minimum gap and time headway, so they queue nose-to-tail instead of overlapping.
  • Lanes and junctions. Cars keep right on marked lanes (white centre dashes) and stop at white stop lines where three or more roads meet. At a junction each movement (straight, left, right) follows its own curve. A car only enters when no crossing movement is inside the junction and there's room beyond it. Waiting cars go first come, first served, with zipper merging into the same exit. Cars pulling out of driveways wait for a gap.
  • Fewer, representative cars. The fleet is thinned until the busiest road carries at most about 80 cars a day (1,500 cars at most), so each car stands for several people. The traffic panel shows how many.

Limits: cars cross a tile in about 8 game minutes, so on-screen driving is slower than the computed commute minutes. There's no lane changing, and a car stuck for about two hours (the time to drive 15 tiles) is let through as a "ghost" to break any rare gridlock. Commute times now influence desirability and growth; a separate happiness model is not implemented.

Construction is charged per unique changed tile. Invalid strokes are rejected in full, without partially spending money. Building on water is rejected; raise the land first.

Zone subtypes

Zone Subtypes Effect
Residential Low, medium, high density Growth caps at level 2, 3 and 4 (24 residents per level)
Commercial Retail, office, entertainment 12 jobs/level up to level 3; 16 jobs/level; 10 jobs/level, with 7-hour evening shifts starting 16:00–18:45
Industrial Manufacturing, high tech, farming 20 jobs/level, smoky; 14 jobs/level, clean; 6 jobs/level up to level 3, no smoke
Power Coal, solar, nuclear, wind, battery Generation and storage capacities as listed below

Inspect a lot to see its subtype, level cap and staffing.

Buildings and employment

There are 69 original, texture-free building archetypes, plus power-line pylons.

  • Homes: bungalows and small houses through terraces, apartments and twin towers.
  • Retail: shops and market sheds through showrooms, department stores, shopping centres and retail parks.
  • Offices: small offices and bank branches through office pavilions, glass offices and skyscrapers.
  • Entertainment: diners and pubs, cinemas, bowling alleys, theatres, casino hotels, hotel towers and arenas.
  • Manufacturing: garages and worksheds through freight depots, warehouses, mills and large factories.
  • High tech: start-up units, labs, data centres, campuses and semiconductor plants.
  • Farming: crop fields, market gardens, farmsteads, greenhouses, dairy farms and grain elevators.
  • Power stations:
    • Coal: a brick generating hall with four white corner chimneys and a coal yard, smoking day and night.
    • Solar: rows of tilted panels.
    • Nuclear: two cooling towers that steam continuously, plus a reactor dome.
    • Wind: a tall mast with an animated three-blade rotor.
    • Battery: storage containers and inverter equipment.

Growth changes their silhouettes, not just their height. Facades are built storey by storey: homes get punched windows, balconies with doors and rails, shopfronts and awnings; offices get ribbon windows or full curtain walls. Seeded placement varies colours and orientation, consistently across saves. All growable lots currently occupy one tile; water facilities have larger footprints.

Residential buildings have capacity for 24 residents per level; new capacity fills gradually rather than instantly. Homes need road access, power, water (or migration grace) and a desirability score of at least 50 to accept arrivals. They gain one resident per month plus one per 15 score points above 50, up to capacity. The starter homes begin full. Inspect a home to see its occupancy.

Desirability and neighbourhood recovery

The Desirability map layer and each zoned lot's inspector use the same backend calculation as growth. Red is below 40, yellow 40-49, green 50-69 and teal 70+; grey cells are not zoned. The dashboard reports average suitability and counts of low-score and declining lots. The score describes location suitability, separately from category demand, staffing and essential service requirements.

Each lot starts from a base 50 points. The inspector lists every contribution:

  • Road access: -35 without frontage. Missing roads also block growth immediately.
  • Local jobs: homes gain +15 when their road network has vacancies. Businesses gain +10 with a local workforce, or -10 without one. Disconnected lots receive no job/workforce bonus. No workplaces yet is neutral for homes so new towns can establish their first residents.
  • Parks in the surrounding five-by-five area must connect to the same road network. Homes gain +5 each, capped at +20; commerce and high tech gain +3, capped at +12. Manufacturing and farms receive no park bonus.
  • Nearby developed manufacturing imposes -10 per lot on homes, high tech and farms, or -5 on commerce, capped at -40. Manufacturing itself is tolerant. This is a proximity nuisance index, not an air-pollution simulation.
  • Actual assigned one-way commute times are weighted by commuter counts for homes and workplaces. Each minute above 20 costs 0.75 points; failed assigned trips add a proportional penalty. The combined commute penalty caps at -25. Lots with no assigned commute receive no bonus or penalty.
  • Power and water reliability each cost up to 25 points for lost service, measured as time-weighted supplied fractions over the monthly interval. Current service is used before any history exists. Water migration grace suppresses the water score penalty, but actual unmet demand remains visible.

Contributions produce a target clamped to 0-100. Each monthly score moves 35% toward that target, snapping to it within 0.5 points. First assessments initialise from current conditions with no accumulated decline. Inspection does not advance scores or service samples. The displayed target can respond to construction before the monthly score catches up; current service failures block growth immediately, regardless of amenities or the score.

Below 40 for three monthly assessments causes gradual losses: homes lose 5% of occupants (at least one) per month, and businesses lose four condition points in addition to any understaffing decline. Positive business condition recovery is suspended during low-score decline. Between 40 and 45 the poor-month counter is retained but desirability losses stop; reaching 45 clears it. Growth resumes at 50 if other requirements hold. Existing sustained-water-shortage losses take precedence, so they are not added to general desirability losses. Improvements therefore produce gradual recovery rather than instant upgrades.

Save version 8 persists scores, decline counters and partial service samples; older saves start without accumulated desirability decline. Autoplay can add road-accessible parks to improve poor residential sites within its budget. Land value, happiness, air/noise fields and broader environmental effects remain separate future systems.

Commercial and industrial jobs per level depend on the subtype. Only powered, road-served buildings contribute. Each home's workforce is 55% of its actual residents, rounded down. Workers are shared proportionally between businesses on the same connected road network, with deterministic allocation of leftover workers. Separate networks cannot exchange workers. A lot touching multiple networks uses the lowest-index adjacent network. Hiring is aggregate; the trip plan below then matches each home's workers to workplaces.

Business condition starts at 100%. Every month, staffing at least 80% of jobs repairs 4 condition points; partial staffing below 80% loses 3; no staff loses 6. Condition is clamped to 0-100. Below 60% buildings look neglected with boarded windows; at 20% or less they are derelict, with debris. They keep their structure and can rehire and recover without demolition. Businesses only expand when condition is at least 60%, staffing at least 80%, and enough spare local workers exist for the added jobs. New businesses need spare workers too.

The dashboard reports employment, unemployment, vacancies and disrepair; inspect a business for its archetype, staffing and condition. Demand responds to the residents/jobs balance. Monthly taxes are $2 per resident plus $1 per employed worker scaled by business condition (rounded down per business), not per empty job. Road upkeep is $2 per tile; each power station's upkeep depends on its type.

Electricity

Power is a connected network, not a coverage radius. Orthogonally adjacent roads, zones (including undeveloped ones), parks and utility lots share a local grid. Roads represent automatic buried distribution. Empty land does not conduct. Power-line pylons connect across up to 8 tiles in a straight cardinal direction, over empty land, water or roads, stopping at the first other pylon. Supports must be on dry land. Buildings in the span block it; route around them or use their adjacent local distribution. Power lines cost $15 per support and $1/month. Visually, continuous routes use slim utility poles every four tiles, plus endpoints, bends and junctions, with thin sagging wires. Intermediate line tiles still carry the connection and can be inspected or bulldozed.

Facility Capacity Build Monthly upkeep
Coal 800 kW, constant $900 $180
Solar 180 kW at noon; zero from 18:00 to 06:00 $500 $40
Nuclear 4,000 kW, constant $4,000 $450
Wind 120 kW rated; weather-dependent day and night $450 $25
Battery 1,200 kWh; 200 kW charge/discharge $700 $15

Facilities require an adjacent road to operate. Separate electrical islands balance independently: spare supply on a disconnected network cannot prevent a local blackout. When a grid is overloaded, whole buildings lose service, with homes served first, then businesses and public space. Unserved zones cannot grow or supply jobs/residents; their windows go dark.

Developed zones draw power in proportion to development level and subtype, including during outages. Homes peak in the morning/evening, offices during working hours, retail through the day and entertainment in the evening. Industry retains an overnight base load; parks and roads draw a small lighting load. Undeveloped zones draw a small service load so they can establish a connection.

Solar follows the visible sun; wind output varies deterministically with gusts and longer weather cycles. Batteries start empty, absorb surplus and supply shortfalls only on their own grid, at 92% efficiency each way. They have finite charge/discharge rates and cannot create energy. Electrical time follows the visible day at all calendar speeds, with five-minute dispatch steps; pause freezes it. Stored energy persists through save/load.

Open Power grid & graphs at the top of the dashboard for live demand, generation by source, shortages and storage; a 24-hour demand/generation projection; half-hour meter readings over the last 48 hours; and monthly city-wide average/peak demand versus road-served nameplate capacity. The daily projection excludes storage dispatch and outages. Graphs include numeric data tables. Inspect lots for their grid ID, demand, output and stored energy. The power map layer shows actual service, not just proximity to a plant.

Water and underground infrastructure

  • Water facility / U: choose a groundwater pump or tower and its entrance orientation. Click to place the entire footprint; the preview marks the road entrance. Pumps occupy 2 x 1 cells (1 x 2 when rotated); towers occupy 2 x 2. Footprints must be dry, empty, inside the district border and vary by at most one terrain level. Foundations accommodate that slope.
  • Water pipes / J: drag a connected underground route, $3 per new tile. Pipes coexist with roads and buildings. Connect a pipe under the facility's northwest anchor; for rotated facilities, continue it across the footprint to reach the road pipe. A facility also needs power and a road at its specific entrance. The water panel explains each missing requirement.
  • Remove pipes / K: removes only pipes, $1 per tile. Ordinary bulldozing leaves pipes intact. Bulldozing any facility cell removes its whole footprint for $5, discarding its stored water. No construction refunds.
Facility Supply or storage Build (whole facility) Monthly upkeep Power
Groundwater pump 1,200 m3/day $1,000 $60 12 kW
Water tower 600 m3, initially empty $650 $15 2 kW

Groundwater is an unlimited abstract source on dry land in this first release. Pipes have no pressure or throughput limit and their upkeep is included in facility upkeep. Pipes serve lots within Manhattan distance two. Each lot uses its nearest pipe (ties by tile index), so overlapping catchments cannot merge networks or double supply. A disconnected closer pipe can isolate a consumer. Both pumps and towers require power and their entrance road to operate; stored water remains in an inactive tower until service is restored.

Demand is 0.5 m3/day per zoned lot plus 0.15 per resident, 0.25 per commercial worker or 0.5 per industrial worker. Coal/nuclear lots also request 6 m3/day; thermal power shutdown from water shortages is not yet simulated. Water shortages are allocated proportionally within each pipe network. Production is consumed, stored, or spilled; towers discharge only their actual stored volume. The five-game-minute dispatch follows the day clock, like electricity, even when the monthly economy runs faster. Offscreen districts use the same water steps.

Outside migration grace, new growth and move-ins require full water supply. After three consecutive shortage months, homes lose 10% of their occupants (at least one) per month; businesses lose condition. Reconnection clears the shortage counter and normal gradual growth/recovery resumes. New starter towns include a connected pump and pipes. Older saves without water infrastructure receive 24 months of grace, persisted across saves, with a visible countdown.

Use Water pipes & supply to see cyan pipes, green supplied lots, yellow partial supply and red shortages. Pipe colouring takes precedence; inspect a lot for its actual served volume and network. The dashboard shows demand, production, unmet demand, storage, filling/drawing and facility upkeep. Water networks remain district-local. Water quality, treatment, sewage, pressure, extraction limits and pipe failures are future systems.

Named saves and autosave

Enter a slot name in the top bar, then Save region or Load. Names allow 1-48 letters, digits, underscores or hyphens. city retains the existing saves/city.json path; other slots use saves/<name>.json. Loading asks before replacing the current region. All writes use atomic replacement.

The server autosaves every two real minutes into the oldest of three slots: autosave-1, autosave-2, autosave-3. They can be loaded from the slot list but cannot be overwritten by the manual Save button. Autosave errors appear in the region panel. Rotating autosaves are bounded recovery points, not permanent archives: make a named manual save for a milestone. Restarting still opens the demonstration region until you load a save.

Region wrapper version 1 now contains district save version 8, including pipe layers, facility footprints/rotation, stored water, shortage duration and grace, as well as desirability/reliability history, occupancy, power and previous simulation state. Versions 2-7 migrate; the old 40 x 40 format remains unsupported. Existing single-tile power plants keep their original schema. The save belongs to the server, not the browser; this is a local single-user app. KSC_SAVE_DIR can select an isolated save folder for development runs.

Light, weather and nature

These are purely visual and run in the browser; they don't change the simulation.

  • Sun and shadows. The sun rises due east at 06:00, stands 45° above the southern horizon at noon and sets due west at 18:00. Buildings, trees and terrain cast shadows that follow the camera. Light warms near dawn and dusk, and nights turn a darker blue while staying readable.
  • Stars. At night, square, unblurred stars fill the sky. They wheel from east to west with the game clock around a pole 45° above the northern horizon, on the same path as the sun, and fade out at dawn and below the horizon.
  • Trees. Seven varieties (fir, pine, oak, birch, poplar, a few autumn trees and shrubs) grow in clumped, mixed woods. Uplands are mostly conifers; beaches and snowy peaks have none. Treetops lean downwind, in the direction smoke drifts, and rock in gusts; trunks stay still. The sway runs on real time, so it continues while the game is paused, and tree shadows sway too.
  • Cars at night. Cars keep their own colours, darkened by the night light like everything else, and carry headlights, tail lights and a pool of headlight light on the road ahead.
  • Windows. Every pane belongs to a room. Homes light a random, different set each day: in the evening, lights come on between 17:30 and 20:00 and go off between 21:30 and midnight; some early risers light up between 05:20 and 06:40 until 06:50–08:00. About a quarter of homes stay dark all day. Office floors light through the working day, with a few late workers, and shops until the evening. Entertainment venues glow in party colours (pink, violet, amber, teal) from 16:00–17:30 until 00:30–02:00, and their neon sign strips (marquees, roof crowns, upright signs) come on at dusk every night; a third of the tubes cycle colour. Business windows light only when staffed; boarded windows never do. A lit window is the pane itself glowing (a per-pane emissive colour), not a second shape drawn over it, so distant windows don't flicker. After dark, street-level venue rooms and low neon signs also throw a fan of their colour across the pavement in front of them, like car headlights.
  • Smoke and steam. Staffed manufacturing buildings with chimneys smoke during working hours. Coal stations smoke and nuclear cooling towers steam around the clock. Puffs drift downwind, grow and fade. High-tech plants and farms are clean, and unstaffed or derelict factories are cold. Smoke follows the game clock, so it freezes when paused.

Headlight pools are flat and can dip into the ground on steep uphill slopes.

Architecture

Per-building balance data lives in building_def/, one JSON file per subtype. The backend validates these definitions at startup and derives zone capacity, jobs, power demand and generation, service coverage, water facilities and desirability profiles from them. GET /api/buildings exposes the same authoritative catalogue to clients.

  • backend/simulation.py: deterministic headless simulation, transactional construction, connectivity, demand, growth, budgets, and versioned save data.
  • backend/app.py: FastAPI endpoints and the real-time clock loop (every 0.25 s). Mutations execute serially on the event loop; snapshots cannot observe half-applied commands. /api/traffic serves the daily trip plan.
  • backend/traffic.py: commute matching, routing, shopping and freight trips, congestion and commute times. It is recomputed lazily after changes, and its revision only changes when the plan does.
  • src/traffic.ts: driver fleet, daily departures, lane and junction geometry and the car-following micro-sim; world.ts draws vehicles and lane markings as instanced meshes.
  • src/world.ts: imperative Three.js renderer. It draws the sloped terrain mesh (an 8-triangle fan per tile, with vertex-colour painting for roads and lots), water, shared flat-colour materials, instanced procedural buildings and trees, paint strokes, and camera controls.
  • src/terrain.ts: the continuous surface model, built from a half-tile vertex grid. Tile centres sit at their own level, and shared edges and corners average their neighbours. It also handles ray picking against the surface, so elevated land correctly hides tiles behind it.
  • src/main.tsx: React dashboard, editing controls, network status, and save/load.
  • backend/power.py: connected electrical islands, load profiles, generation and finite-energy storage dispatch. GET /api/power exposes chart data.
  • src/power.tsx: live power report, daily and long-term graphs and data tables.
  • src/buildings.ts: deterministic archetypes and flat-coloured multipart models, shared by the renderer and inspector.
  • Snapshots are compact strings and arrays, gzip-compressed, and polled every 1.2 seconds through /api/view, with session/revision checks for the focused city and cached LOD meshes for nearby districts. Terrain meshes are rebuilt only when the terrain revision changes. State revisions prevent stale responses from overwriting newer command results.

Deliberate first-milestone limits

Each district is 100 x 100 with integer terrain levels. Geometry is generated directly in the browser, not loaded from OBJ/MTL or GLB files yet. There are no textures or external asset downloads. This prototype does not yet include transit, water quality/treatment, pollution, rivers, bridges, tunnels, per-road-type grade limits, automatic road grading, disasters, regional economies, general residential abandonment, undo, or full SC4 mechanics. Parks are decorative, not a land-value simulation. Negative treasury is allowed; construction is blocked when unaffordable, but bankruptcy is not simulated.

The backend currently runs in one process, with ordinary Python tile records. Before scaling, measure headless tick times, migrate hot fields to dense arrays, partition local calculations into chunk jobs, then introduce persistent worker processes and shared-memory double buffers. Regional connectivity and economics need explicit global phases. Python threads are not presented as a CPU-scaling solution. Binary chunk deltas, an ordered command journal, asset export, and worker scheduling are future work rather than unimplemented promises.

Autoplay and repeatable development scenarios

The dashboard defaults to Continuous stress test. It spends construction funds above the reserve (default $5,000), repeatedly lays out connected 36-by-18 neighbourhoods (12-by-6 on tighter sites), and zones their available frontage. It cycles all implemented road, zone, power and water facility variants, plus parks, pylons and pipes. There is no population target, housing inventory gate, monthly construction gate or six-month deficit buffer in stress mode.

Construction uses ordinary validated commands and actual costs. It neither grants funds nor bulldozes existing development. The reserve limits construction spending; operating losses can still take the treasury below it. Pausing the simulation pauses construction. Loading or changing district stops autoplay. Settings are session-only. The optional Targeted growth mode retains the older population target, twelve actions per observed month and six-month deficit runway.

Live stress construction runs every server update, with at most four commands and a soft 50 ms work budget. It yields between commands; an individual command or planning pass can exceed that budget. The panel shows last construction/simulation update timings, queued commands, catalogue coverage and recent actions. This is load instrumentation, not automatic multicore simulation scaling.

For repeatable isolated scenarios without changing the live region:

.\.venv\Scripts\python.exe -m backend.autoplay --seed 42 --months 12 --starting-money 2700000 --reserve 5001 --actions-per-month 128 --output runs/wealthy-stress
.\.venv\Scripts\python.exe -m backend.autoplay --mode growth --seed 7 --empty --months 120 --target 2000 --output runs/growth-7

--starting-money explicitly sets the isolated benchmark's initial treasury; normal live autoplay never changes the treasury except through game commands. The deterministic headless workload defaults to 64 commands before each simulated month. Same inputs and code reproduce construction and simulation state; wall-clock timings vary. Reports include every command, monthly roads/zones, finances, population, water service, construction time and simulation p95. The runner writes report.json and a loadable city.json; use distinct output directories because these files are overwritten on repeated runs. Back up the live save before replacing it with a generated city for inspection.

API: GET /api/autoplay reports status; POST /api/autoplay accepts {"enabled": true, "mode": "stress", "reserve": 5001} or {"enabled": false}. mode: "growth" also uses target (default 2000). The stress planner lives in backend/stress.py. New waste, civic and other systems need construction policy and coverage entries when implemented. Expansion currently stays in the focused district and does not terraform; exhausted affordable terrain is reported explicitly. It does not guarantee a balanced economy or full occupancy: large real workloads and exposed system failures are the purpose.

Validate

.\.venv\Scripts\python.exe -m unittest backend.test_simulation backend.test_power backend.test_region backend.test_terrain backend.test_roads backend.test_autoplay backend.test_water backend.test_saves backend.test_desirability -v
npm.cmd test
npm.cmd run build

Tests cover seeded terrain (levels above and below water, slope limits, a flat starter town), terraforming cascades and their rejection near development, lowering land into water, starter-city growth, revenue, construction atomicity and funds, road/power prerequisites, save round-trips and rejection of old or invalid saves, compact API state and API validation. Power tests cover connectivity, long spans and cuts, independent islands, renewable cycles, load shedding, battery rate/energy limits, efficiency and save/replay. The browser build performs strict TypeScript checking before Vite bundles the application. Camera tests verify perspective depth scaling, terrain picking, occlusion by hills, and water-surface picking. Employment tests cover worker conservation, proportional hiring, disconnected networks, business decay and recovery, growth gating, tax effects, and condition save migration/replay. Building tests check archetype diversity, lot footprints and derelict geometry.

About

SimCity4 clone in Python and a Three.js UI

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages