Repository navigation
Open
Description
- Owner: @Shuhan6017 ·
minigit/remote.py,tests/test_remote.py - Shared deliverables:
docs/demo.md, README setup/demo link,docs/writeups/module-4.md - Depends on: Week 8 - M4: Network performance + final end-to-end checkpoint #58 and the integrated Week 8 module work in Week 8 - M1: Measured storage optimizations + packfile regression checks #55, Week 8 - M2: Status/diff performance + working-tree regression checks #56, and Week 8 - M3: History performance + final CLI consistency audit #57
- Coordinate the Week 9 storage, working-tree, and history contributions with all three owners
- Branch from updated
main:docs/week9-integrated-demo - Plan: Weeks 9-10 buffer, stretch goals, and demo prep
Current checkpoint (2026-11-18)
- Starting point: Document storage formats and add a reproducible snapshot demo #72 supplies only the storage segment of
docs/demo.mdand Module 1's draft writeup. The full local/network walkthrough and Modules 2-4 writeups remain to be assembled after Week 8 - M4: Network performance + final end-to-end checkpoint #58. - Include Week 9 - Team: Track the project with mini-git + recovery rehearsal #73's project-source trial, which covers the original goal of using mini-git on the team's own development. Reuse the same rehearsal and link its evidence.
- Prioritize core integration, reproducible measurements, setup, and recovery. Record the team's select/defer decision on optional stretch goals; no stretch implementation is required for core completion.
Scope
Start the planned buffer with a complete demo rehearsal, integration fixes, draft writeups, and a deliberate decision on optional stretch work. Week 8 issues remain prerequisites, not assumed accomplishments. Planning/writeups can start now; final rehearsal uses the integrated revision. Keep the authenticated wire protocol and current push/pull APIs compatible.
Steps
- Review Week 8 - M4: Network performance + final end-to-end checkpoint #58 with all four owners and list remaining blockers using existing issue links. Prioritize reproducible correctness/setup failures before optional features; give each remaining finding a reproduction, owner, and disposition for the final Week 10 handoff.
- Write one
docs/demo.mdrunbook covering a clean install/build, disposable temporary repositories, separate terminal roles, server start/stop, and expected results. Use the actual supported CLI. Include reset/cleanup instructions and a README link so a teammate can rehearse independently. - Combine the four module segments into a live-or-recordable walkthrough: init -> add -> commit -> branch -> checkout -> fast-forward -> clean two-parent merge -> push -> pull between two repository instances. Include status, diff, and log at useful checkpoints; verify branch tips, file contents/modes, index, and both-parent history.
- Rehearse the failure/recovery segment: repeated up-to-date sync, stale/diverged push rejection, pull conflict -> resolve -> add -> two-parent commit, and one interrupted transfer -> retry. Reuse Week 8 - M4: Network performance + final end-to-end checkpoint #58's integration helpers and regression tests; add a focused test only when the rehearsal exposes a new defect.
- Keep the established transfer guarantees: validate complete reachable history before publishing refs; rejected/interrupted transfers preserve refs, HEAD, files, and index while verified objects may remain for retry; intentional merge conflicts keep markers and pending state. Confirm that a failed session does not prevent the next client from connecting.
- Document the current networking limitations, including the plaintext token/TCP discussion deferred in Week 2 - M4: TCP handshake + RemoteServer #13. Explain the loopback/disposable-token demo setup and keep credentials out of captured output and errors. Record SSH/TLS or other protocol changes as separate proposals, not implied delivered features.
- Draft
docs/writeups/module-4.md: wire framing, authentication, missing-object transfer, both-parent graph traversal, ref publication order, push conflict detection, pull integration, failure/retry behavior, design tradeoffs, and what you would change next. Link the measured Week 8 results. Confirm the other three owners have drafted their own writeups. - Run a team stretch-goal triage using the plan's list: interactive rebase, pre/post-commit hooks, a history TUI, and submodules. Record a select/defer decision with rationale and available time. Any selected goal needs its own bounded issue, owner, dependencies, tests, and acceptance criteria. Selecting none is valid while core work remains; no stretch feature is a prerequisite for completing this issue.
- Have a teammate reproduce the full runbook from a clean setup and record the tested revision. Run
scripts/build.shandscripts/quality-check.sh; keep large benchmarks opt-in and automated network checks on loopback/port0with bounded waits and cleanup. Open a linked PR and request teammate review.
Team checkpoint
One teammate can run the complete local and two-repository demo from the runbook. All four short writeups are drafted. Remaining blockers and the stretch-goal decision are explicit, leaving Week 10 for final fixes and the live/recorded presentation.
Done when
- Clean setup/build and the complete walkthrough have been reproduced at a recorded revision
- Rejection, conflict resolution, and interrupted-transfer retry preserve the documented behavior
- Shared demo instructions and network limitations match the shipped CLI/protocol
- Module 4 writeup is drafted and all four module writeups are accounted for
- Remaining findings have owners; stretch goals have an explicit select/defer decision
- Build and quality check are green; linked PR and review request are ready
Activity