Skip to content

Week 10 - M1: Storage verification + final design writeup #67

Open

Description

@aman-a-shah

Current checkpoint (2026-11-18)

Scope

Finish the final week of the planned Weeks 9-10 buffer. Earlier open issues remain prerequisites, not assumed accomplishments. Fix reproducible blockers, finalize the writeup, and verify the delivered behavior at the team's recorded demo revision. Preserve existing module contracts; optional stretch work is only included if separately selected and completed after core readiness.

Steps

  1. Review Week 9 - M1: Storage readiness + object-format writeup #60 and the merged storage work. Keep unresolved findings linked to their existing issues, with a reproduction and explicit disposition; do not close earlier work solely because the calendar advanced.
  2. Verify loose, packed-only, and mixed-store reads on the final integrated revision. Reuse corruption, duplicate-write, failed-publication, fresh-store, and multi-pack regressions. Confirm selected objects remain hash-checked and explain the metadata cache's invalidation assumptions.
  3. Reproduce the storage benchmark with recorded commit IDs, Python/platform, fixture parameters, commands, and fresh/repeated run definitions. Keep the reconciliation from Bound pack-index caching and verify replacement detection #71 between docs/week8-performance.md and docs/performance.md current; distinguish the 512-blob storage fixture from the whole-project benchmark in Week 7 - M4: Network diagnostics + end-to-end performance baseline #47. Treat --no-cache as a controlled comparison on current code, not automatically an exact historical revision.
  4. Finalize the module writeup: object framing/hashing, tree serialization, compression and pack layout, validation/publication order, measured tradeoffs, limitations, and lessons learned. Preserve the corrections to historical-revision and worktree claims made in Bound pack-index caching and verify replacement detection #71.
  5. Reproduce the storage demo using actual shipped commands or documented Python APIs. Keep packed-only fixture preparation in disposable repositories; document deferred pruning and delta compression accurately.
  6. Have a teammate follow the storage segment at the final demo revision. Run scripts/quality-check.sh, add focused regressions for new fixes, open a linked PR, and request teammate review. Supply final links and unresolved findings to M4's handoff.

Done when

  • Storage checks pass on the final integrated revision
  • Measurements are reproducible and linked from the shared performance report
  • Object/pack docs and final Module 1 writeup match shipped behavior
  • Teammate rehearsal, quality check, and linked reviewed PR are recorded

Activity

  1. added
    module-1
    week-10
    on Nov 8, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

module-1week-10

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions