Skip to content

Week 10 - M2: Working-tree acceptance + final demo documentation #68

Open

Description

@aman-a-shah

Current checkpoint (2026-11-18)

Scope

Finish the final week of the planned Weeks 9-10 buffer. Earlier open issues remain prerequisites, not assumed accomplishments. Fix reproducible blockers, finalize the writeup, and verify the delivered behavior at the team's recorded demo revision. Preserve existing module contracts; optional stretch work is only included if separately selected and completed after core readiness.

Steps

  1. Carry forward unresolved Week 9 - M2: Working-tree demo rehearsal + usability fixes #61 findings with reproductions and owners. Review W8: feat/working-tree-performance-finalization #64's final behavior and avoid duplicating the superseded W7: Feat/status diff polish #54 implementation.
  2. Make the performance results reproducible: docs/performance.md currently instructs readers to run bench_working_tree.py, but W8: feat/working-tree-performance-finalization #64 does not include that file. Check in the actual benchmark or replace the instructions with an available equivalent and rerun the measurements. Record exact before/after revisions and align with Week 7 - M4: Network diagnostics + end-to-end performance baseline #47's shared fixture when available; do not present incomparable fixtures as one baseline.
  3. Have a teammate demonstrate a file committed, edited/staged, then edited again; verify status distinguishes staged and unstaged bytes and commit records only the index snapshot. Verify context hunks, binary summaries, mode-only changes, unusual paths, and missing-final-newline output using existing coverage.
  4. Rehearse safe checkout and persistent conflict resolution with M3: dirty or colliding untracked work is preserved; unresolved paths remain visible; explicit add (including deletion resolution) enables the two-parent commit. Status/diff must remain read-only. Keep fresh-process regression coverage on the integrated revision. M2 currently calls the private _read_pending_merge() helper; coordinate adoption of M3's new public get_merge_status() from Polish log output and CLI errors #66 so the documented module boundary matches the implementation.
  5. Finalize docs/writeups/module-2.md with index snapshots, nested trees, Myers diff reuse, checkout safety, the file-walk optimization, measurements, tradeoffs, and lessons learned. Update README/demo expected output to include the branch heading and actual current diff semantics.
  6. Add focused tests for new fixes, run scripts/quality-check.sh, and open a linked PR for teammate review. Record the tested revision and hand off remaining limitations to M4.

Done when

  • Missing benchmark/reproduction instructions are fixed and verified
  • Staging, status/diff, checkout, and conflict resolution pass on the final revision
  • Final Module 2 writeup and demo output match the shipped CLI
  • Teammate rehearsal, quality check, and linked reviewed PR are recorded

Activity

  1. added
    module-2
    week-10
    on Nov 8, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

module-2week-10

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions